FROM£17.99
Handmade, 100% Compostable and Recyclable.
Vegan Friendly and Plastic Free.
Stylish, Comfortable, Strong, Soft and Durable, Adjustable Double Ended Long Dog Lead.
Puddle’s Double Ended Long Lead has adjustable Welded D -Rings to enable the lead to be adjusted into different lead lengths. An ideal lead to use in a variety of different ways dependant on the pet and owners’ requirements. Each end of the lead has good quality welded swivel clasps.
Perfect for dog/puppy training, having controlling different situations, including hands free training.
Also great for walking two dogs together!
Short Length for Heel Work
Medium Length for Heel Obedience’s
Long Length for Recall/Distance Work
Plus, many other ways the lead can be used.
Washable at 30 degrees, lay out flat to dry.
When the product reaches the end of its useable life, cut the metal chain from the collar and place in the recycling bin. Cut the cotton material collar up into small bits and place into the compost bin to return to nature.
Approximate sizes
Medium – 2 metres long by 19mm wide
Large – 2 metres long 25mm wide
Puddle & Stick